← All block themes LT Strata AI-ready block theme Colours Get this theme

About  /  Survey, lab and reporting under one roof

A small team that reads the ground for a living

Geophysicists, geotechnical engineers and lab technicians who stay with your project from the desk study to the final ground model.

Field record

Sample figures.

Survey lines run

12,480km

Cone penetration tests

1,326

Laboratory tests reported

38,900

Deepest borehole

82.5m

Offshore wind turbines at sea
Offshore wind array, 42 locations (sample project)
Harbour quay and port works
Harbour quay extension, 18 CPTs (sample project)

Ground truth for what you build next

Wind farm foundations, harbour walls, export cables and sea defences. Different structures, the same question: what is under the seabed, and how will it behave?

Open sea along a cable route
Export cable route, 64 km corridor (sample project)
Coastline and sea defences
Coastal defence scheme, intertidal boreholes (sample project)

The people who read the ground

Geophysicists, geotechnical engineers, geologists and lab technicians who work on the same projects from start to finish.

Ines Duarte

Ines Duarte

Principal geotechnical engineer

Turns test results into design parameters and leads the interpretive reports.

Tomas Brandt

Tomas Brandt

Lead geophysicist

Plans the survey lines and reads the layers in the sub-bottom data.

Amara Okoye

Amara Okoye

Laboratory manager

Runs the soils lab and checks every result against the field logs.

Kenji Arai

Kenji Arai

Party chief, offshore

Leads the crew on deck and sends the daily reports from the field.

Sample team and bios.

What clients tell us after the report

“The ground model came with the uncertainties spelled out, so our designers knew exactly where to be careful and where they could save steel.”

Sample client, offshore wind developer

“Daily reports from the vessel meant we were never guessing. When the weather closed in, we had a revised plan the same evening.”

Sample client, port authority

“They found two buried obstructions on the cable route before installation. Rerouting on paper cost far less than finding them later.”

Sample client, cable contractor

Reply within two working days

Know the ground before you build on it

Send us your site or route and what you plan to build. A project engineer replies with questions, a scope and a fixed price.

Demo photos from Pexels by Bráulio jardim, Alisha Bai, Tom Wielspütz, Blue Record, Mikhail Nilov, Gustavo F. de Carvalho-Souza, Ifeyinka Adeyemo, Daniel & Hannah Snipes, Tran Nhu Tuan, Atmadeep Das, Cecilia Ravalli, Arwin de Bruine. Photos are for this demo only and are not included in the theme download.